Simulation of trajectory correction in early commissioning of the Advanced Light Source upgrade
Abstract
The ALS upgrade into a diffraction-limited soft x-rays light source requires a small emittance, which is achieved by much stronger focusing than in the present ALS. Very strong focusing elements and a relatively small vacuum chamber make the required rapid commissioning a significant challenge. This paper will describe the progress towards a start-to-end simulation of the machine commissioning and present first simulation results.
- Publication:
-
Journal of Physics Conference Series
- Pub Date:
- September 2018
- DOI:
- 10.1088/1742-6596/1067/3/032001
- Bibcode:
- 2018JPhCS1067c2001H