Overview of new GNSS tropospheric products for GNSS-meteorology and their assessment at Geodetic Observatory Pecny (CZ)
Abstract
Geodetic Observatory Pecný (GOP) has a long-term experience in the estimation of precise tropospheric parameters from GNSS permanent stations, in particular under the limited timelines of near real time. More than a decade, the GOP zenith total delays (ZTD) contributed to various projects in Europe (COST-716, TOUGH, E-GVAP, E-GVAP II) and the operational ZTD hourly updated product flows via the meteorological observation exchange network - GTS - to the end users worldwide. Currently, the GOP regional ZTD product is operationally assimilated in Météo France and UK MetOffice at least and further exploited in various ways at many other meteorological institutions. New developments at GOP over last three years consist of a) implementation and assessment of the global hourly ZTD product of about 170 stations, b) implementation of routine multi-GNSS (GPS+GLONASS) ZTD European product, and c) implementation of ultra-fast/real-time ZTD product. The GOP global ZTD product has been implemented on request of the meteorological institutions running global numerical weather forecasting models. The global ZTD product was seriously evaluated over ten months (Oct 2009 - Aug 2011) when compared to reprocessed EUREF and IGS ZTDs, radiosondes and ZTDs derived from UK MetOffice's global numerical weather model. After the evaluation (and on special request of UK MetOffice) the product has been switched from testing to operational status within the framework of the EUMETNET EIG GPS Water Vapour Programme (E-GVAP) and officially disseminated via the GTS network. The GOP multi-GNSS ZTD solution has been tested since 2009 shortly after developing GOP ultra-rapid GPS+GLONASS orbits for the International GNSS Service (IGS). A specific bias of mean value 1.5 mm was identified between GPS- and GLONASS-only ZTD at that time, and relation to the IGS05 antenna phase centre offset and variation models (PCO+PCV) identified. Consequently, the implementation of a routine operation has been done after the GPS week 1632 together with adopting IGS08 PCO+PCVs, which eliminated the bias and demonstrated an overall general better consistence between GPS- and GLONASS-only ZTD estimates. The multi-GNSS ZTD product runs in parallel to the GPS-only and is going to replace the current official GPS-only product after more than a year assessment. This multi-GNSS product has assesses a satisfactory quality and robustness of unofficial IGS ultra-rapid GPS+GLONASS orbits necessary for multi-GNSS solution. The GOP ultra-fast and real-time ZTD estimation is being developed with in-house software application using own G-Nut library and Precise Point Positioning technique (in contrast to all other GOP ZTD products based on Bernese GPS software and based on double-difference observations). The IGS Real-time Pilot Project orbit and clock corrections are seriously exploited in these ultra-fast and real-time tropospheric products aimed for nowcasting and severe weather monitoring. Our implementation assesses an optimal balance between timelines and product quality required by these applications.
- Publication:
-
AGU Fall Meeting Abstracts
- Pub Date:
- December 2012
- Bibcode:
- 2012AGUFM.G14A..06D
- Keywords:
-
- 1220 GEODESY AND GRAVITY / Atmosphere monitoring with geodetic techniques