Overview of the National Centralized Tokamak programme
Abstract
An overview is given of the National Centralized Tokamak (NCT) programme as a research programme for advanced tokamak research to succeed JT-60U. The mission of NCT is to establish high beta steady-state operation for DEMO and to contribute to ITER. The machine flexibility is pursued in aspect ratio and shape controllability for the demonstration of the high-β steady-state, feedback control of resistive wall modes, wide current and pressure profile control capability and also very long pulse steady-state operation. Existing JT-60 infrastructure such as the heating and current drive system, power supplies and cooling systems will be best utilized for this modification.
- Publication:
-
Nuclear Fusion
- Pub Date:
- March 2006
- DOI:
- 10.1088/0029-5515/46/3/S05
- Bibcode:
- 2006NucFu..46S..29K