The August 2002 flood in Salzburg / Austria experience gained and lessons learned from the ``Flood of the century''?
Abstract
On the {12th} of August 2002 a low pressure system moved slowly from northern Italy towards Slovakia. It continuously carried moist air from the Mediterranean towards the northern rim of the Alps with the effect of wide-spread heavy rainfall in Salzburg and other parts of Austria. Daily precipitation amounts of 100 - 160 mm, in some parts even more, as well as rainfall intensities of 5 - 10 mm/h , combined with well saturated soils lead to a rare flood with a return period of 100 years and more. This rare hydrological event not only caused a national catastrophe with damages of several Billion Euro, but also endangered more than 200,000 people, and even killed some. As floods are dangerous, life-threatening, destructive, and certainly amongst the most frequent and costly natural disasters in terms of human hardship as well as economic loss, a great effort, therefore, has to be made to protect people against negative impacts of floods. In order to achieve this objective, various regulations in land use planning (flood maps), constructive measurements (river regulations and technical constructions) as well as flood warning systems, which are not suitable to prevent big floods, but offer in-time-warnings to minimize the loss of human lives, are used in Austria. HYDRIS (Hydrological Information System for flood forecasting in Salzburg), a modular river basin model, developed at Technical University Vienna and operated by the Hydrological Service of Salzburg, was used during the August 2002 flood providing accurate 3 to 4 hour forecasts within 3 % of the real peak discharge of the fast flowing River Salzach. The August {12^th}} flood was in many ways an exceptional, very fast happening event which took many people by surprise. At the gauging station Salzburg / Salzach (catchment area 4425 {km^2}) it took only eighteen hours from mean annual discharge (178 {m3/s}) to the hundred years flood (2300 {m3/s}). The August flood made clear, that there is a strong need for longer lead times in Salzburg's flood forecasts. Methods to incorporate precipitation forecasts, provided by the Met Office, as well as observations of actual soil conditions, therefore, have to be developed and should enable hydrologists to predict possible scenarios and impacts of floods, forecasted for the next 24 hours. As a further consequence of the August 2002 flood, building regulations, e.g. the use of oil tanks in flood prone areas, have to be checked and were necessary adapted. It is also necessary to make people, who already live in flood prone areas, aware of the dangers of floods. They also need to know about the limits of flood protection measurements and about what happens, if flood protection design values are exceeded. Alarm plans, dissemination of information by using modern communication systems (Internet) as well as communication failure in peak times and co-ordination of rescue units are also a subject to be looked at carefully. The above mentioned measurements are amongst others of a 10 point program, developed by the Government of the Province of Salzburg and at present checked with regards to feasibility. As it is to be expected, that the August 2002 flood was not the last rare one of this century, experience gained should be valuably for the next event.
- Publication:
-
EGS - AGU - EUG Joint Assembly
- Pub Date:
- April 2003
- Bibcode:
- 2003EAEJA....12491W