Loading of Launch Vehicle when Launching from Floating Launch Platform
Abstract
equator, which is a most effective way from payload capability standpoint. But mobility of the Launch Platform conditions an increase in LV loading as compared with onground launch. Therefore, to provide efficiency of lounching from LP requires solving certain issues to minimize LV loading at launch processing. The paper at hand describes ways to solve these issues while creating and operating the international space launch system Sea Launch, which provides commercial spacecraft launches onboard Zenit-3SL launch vehicle from the floating launch platform located at the equator in the Pacific. Methods to decrease these loads by selecting the optimum position of LP and by correcting LP trim and heel were described. In order to account for impact of weather changing (i.e. waves and winds) and launch support operations on the launch capability, a system of predicted load calculation was designed. By measuring LP roll and pitch parameters as well as wind speed and direction, the system defines loading at LV root section, compares it with the allowable value and, based on the compavision, forms a conclusion on launch capability. launches by Sea Launch.
- Publication:
-
IAF abstracts, 34th COSPAR Scientific Assembly
- Pub Date:
- January 2002
- Bibcode:
- 2002iaf..confE.443A