The PEP-II B-factory: status and prospects
Abstract
The PEP-II asymmetric electron-positron collider, which was completed in July 1998, has started delivering luminosity to the BaBar experiment at SLAC. This paper summarizes the design issues of this novel accelerator complex, the PEP-II performance as achieved during the commissioning runs, and the early running experience with BaBar.
- Publication:
-
Nuclear Instruments and Methods in Physics Research A
- Pub Date:
- May 2000
- DOI:
- 10.1016/S0168-9002(00)00022-X
- Bibcode:
- 2000NIMPA.446...59K