Postflight hardware evaluation (RSRM-29, STS-54)
Abstract
This document is the final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-29 flight set. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64221), represents a summary of the RSRM-29 hardware evaluation. Disassembly evaluation photograph numbers are logged in TWA-1990. The RSRM-29 flight set disassembly evaluations described in this document were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on September 9, 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.
- Publication:
-
Final Report Thiokol Corp
- Pub Date:
- September 1993
- Bibcode:
- 1993thco.reptZ.....
- Keywords:
-
- Damage Assessment;
- Postflight Analysis;
- Postmission Analysis (Spacecraft);
- Space Shuttle Boosters;
- Space Transportation System Flights;
- Joints (Junctions);
- Rocket Nozzles;
- Safety Factors;
- Thermal Insulation;
- Space Transportation