Planning assistance for the 30/20 GHz program, volume 2
Abstract
In the baseline concept development the communications payload on Flight 1 was specified to consist of on-board trunking and emergency communications systems (ECS). On Flight 2 the communications payloads consisted of trunking and CPS on-board systems, the CPS capability replacing the Flight 1 ECS. No restriction was placed on the launch vehicle size. Constraints placed on multiple concept development effort were that launch vehicle size for Concept 1 was restricted to SUSS-D and for Concept 2 a SUSS-A. The design concept development was based on satisfying the baseline requirements set forth in the SOW for a single demonstration flight system. Key constraints on contractors were cost and launch vehicle size. Five major areas of new technology development were reviewed: (1) 30 GHz low noise receivers; (2) 20 GHz Power Amplifiers; (3) SS-TDMA switch; (4) Baseband Processor; (5) Multibeam Antennas.
- Publication:
-
Final Report Western Union Telegraph Co
- Pub Date:
- September 1981
- Bibcode:
- 1981wutc.reptR....A
- Keywords:
-
- Communication Satellites;
- Extremely High Frequencies;
- Multibeam Antennas;
- Contractors;
- Frequency Division Multiple Access;
- Time Division Multiple Access;
- Communications and Radar