Abstract
The SIRIO 2 flight model status, launch and orbital phase ground segment, and launch vehicle, composite and range facilities interfaces are reviewed. The satellite design is flight qualified and the flight model is acceptable. System level requirements are met. Nonconformances, deviations, and waivers are adequately dealt with. A set of spares is available, as is launch support equipment. Plans and procedures for the launch campaign are provided.
- Publication:
-
Meeting held 26 Nov. 1981
- Pub Date:
- November 1981
- Bibcode:
- 1981meet.meet......
- Keywords:
-
- Preflight Analysis;
- Prelaunch Tests;
- Sirio Satellite;
- Equipment Specifications;
- Mathematical Models;
- Satellite Design;
- Satellite Ground Support;
- Launch Vehicles and Space Vehicles