Hydrogen storage and production in utility systems
Abstract
Work was initiated on the development of break even capital costs for electric storage devices based on the energy modeling work and a preliminary estimate of $2741 kW (75% efficient) was obtained, based on a projection of present practice and cost trends to 1985. The hydrogen reservoir built for PSE&G of New Jersey was completed, tested, and shipped. Two safety reservoir rupture tests were completed and indicated that iron-titanium hydride appears to present no acute hazards in an extreme rupture accident condition even when fully hydrided.
- Publication:
-
Quarterly Progress Report
- Pub Date:
- April 1974
- Bibcode:
- 1974bnl..reptR....S
- Keywords:
-
- Energy Storage;
- Hydrogen;
- Utilities;
- Cost Estimates;
- Electric Equipment;
- Engineering (General)