T and E guidelines for command and control systems
Abstract
Contents: Conceptual phase; validation phase; full-scale engineering development phase; and substantial production/deployment phase.
- Publication:
-
NASA STI/Recon Technical Report N
- Pub Date:
- April 1974
- Bibcode:
- 1974STIN...7510301.
- Keywords:
-
- Checkout;
- Command And Control;
- Logistics;
- Production Engineering;
- Reliability Engineering;
- Communications and Radar