A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign
Abstract
The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Voltage equipment have been individually commissioned, whereas the integration tests are ongoing. It is a challenging process due to the unconventional application, to the variety of different electrical technologies involved and to the complexity of the interfaces. During the integrated tests of the power supplies the achievement of 700 kV stable operation has been demonstrated for the first time in a Neutral Beam Injector, but an unexpected event occurred, most likely a breakdown in the HV part, which resulted in a fault of the DC generator. A subsequent test using an auxiliary power supply was performed to check the voltage withstanding capability of the HV plant, but another breakdown occurred at around 1MV. This paper describes the activity performed to identify the location of the breakdowns affecting the integrated tests. A test campaign has been devised with increased diagnostic capabilities and specific strategy conceived to trigger intentional breakdowns in specific locations and collect measurement patterns for different cases. The results of the campaign will be presented and the current understanding of the issue will be described, with a view on future tests and further improvements of diagnostics.
- Publication:
-
Fusion Engineering and Design
- Pub Date:
- February 2023
- DOI:
- 10.1016/j.fusengdes.2022.113381
- arXiv:
- arXiv:2304.13434
- Bibcode:
- 2023FusED.18713381Z
- Keywords:
-
- Iter;
- Mitica;
- Neutral beam injector;
- Power supply;
- Acceleration grid power supply;
- High Voltage;
- Breakdown;
- Physics - Plasma Physics
- E-Print:
- doi:10.1016/2022.113381