Experience with Long-pulse Operation of the PIP2IT Warm Front End
Abstract
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.
- Publication:
-
arXiv e-prints
- Pub Date:
- December 2019
- DOI:
- 10.48550/arXiv.1912.03180
- arXiv:
- arXiv:1912.03180
- Bibcode:
- 2019arXiv191203180S
- Keywords:
-
- Physics - Accelerator Physics
- E-Print:
- 4 pages, NAPAC2019