Optimal scheduling of isolated microgrid with an electric vehicle battery swapping station in multi-stakeholder scenarios: A bi-level programming approach via real-time pricing
Abstract
In order to coordinate the scheduling problem between an isolated microgrid (IMG) and electric vehicle battery swapping stations (BSSs) in multi-stakeholder scenarios, a new bi-level optimal scheduling model is proposed for promoting the participation of BSSs in regulating the IMG economic operation. In this model, the upper-level sub-problem is formulated to minimize the IMG net costs, while the lower-level aims to maximize the profits of the BSS under real-time pricing environments determined by demand responses in the upper-level decision. To solve the model, a hybrid algorithm, called JAYA-BBA, is put forward by combining a real/integer-coded JAYA algorithm and the branch and bound algorithm (BBA), in which the JAYA and BBA are respectively employed to address the upper- and lower- level sub-problems, and the bi-level model is eventually solved through alternate iterations between the two levels. The simulation results on a microgrid test system verify the effectiveness and superiority of the presented approach.
- Publication:
-
Applied Energy
- Pub Date:
- December 2018
- DOI:
- 10.1016/j.apenergy.2018.09.211
- arXiv:
- arXiv:1809.10206
- Bibcode:
- 2018ApEn..232...54L
- Keywords:
-
- Isolated microgrids;
- Optimal scheduling;
- Multi-stakeholder;
- Vehicle-to-grid (V2G);
- Battery swapping station;
- Bi-level programming;
- Demand response;
- Real-time pricing;
- Electrical Engineering and Systems Science - Signal Processing;
- Mathematics - Optimization and Control
- E-Print:
- Accepted by Applied Energy