Optimal Scheduling and Exact Response Time Analysis for Multistage Jobs
Abstract
Scheduling to minimize mean response time in an M/G/1 queue is a classic problem. The problem is usually addressed in one of two scenarios. In the perfect-information scenario, the scheduler knows each job's exact size, or service requirement. In the zero-information scenario, the scheduler knows only each job's size distribution. The well-known shortest remaining processing time (SRPT) policy is optimal in the perfect-information scenario, and the more complex Gittins policy is optimal in the zero-information scenario. In real systems the scheduler often has partial but incomplete information about each job's size. We introduce a new job model, that of multistage jobs, to capture this partial-information scenario. A multistage job consists of a sequence of stages, where both the sequence of stages and stage sizes are unknown, but the scheduler always knows which stage of a job is in progress. We give an optimal algorithm for scheduling multistage jobs in an M/G/1 queue and an exact response time analysis of our algorithm.
- Publication:
-
arXiv e-prints
- Pub Date:
- May 2018
- DOI:
- 10.48550/arXiv.1805.06865
- arXiv:
- arXiv:1805.06865
- Bibcode:
- 2018arXiv180506865S
- Keywords:
-
- Computer Science - Performance;
- Mathematics - Optimization and Control