Dephosphorization by Double-Slag Process in Converter Steelmaking
Abstract
The double-slag converter steelmaking process can smelt low- and ultra-low-phosphorus steel and reduce lime and dolomite consumption and the amount of final slag simultaneously. Industrial steelmaking tests on a 150-metric ton converter at the Tangsteel Company were carried out to study this principle and its effect on the dephosphorization ratio and material consumption. The results showed that low-temperature stage could be used with a reduced amount of slag in the double-slag steelmaking process to achieve rapid and efficient dephosphorization. A low-basicity slag ( 1.5-2.0) in the dephosphorization stage is required in double-slag process. The dephosphorization ratio reached a maximum of 71 % when the slag basicity was 1.7. The end-point phosphorus content after the smelting process was reduced from an average of 0.018 mass% to an average of 0.011 mass% and the dephosphorization efficiency increased by more than 6 %. The dephosphorization slag could be poured out rapidly when the FeO content was controlled at 16-20 mass% in the double-slag smelting process. Based on key factors such as an efficient dephosphorization and a rapid iron-slag separation, the production efficiency was improved and the smelting cycle increased by only four minutes over the conventional process.
- Publication:
-
High Temperature Materials and Processes
- Pub Date:
- July 2018
- DOI:
- 10.1515/htmp-2016-0250
- Bibcode:
- 2018HTMP...37..625W
- Keywords:
-
- double slag;
- dephosphorization;
- converter;
- lime consumption