Research of Water Level Prediction for a Continuous Flood due to Typhoons Based on a Machine Learning Method
Abstract
This research aims to improve accuracy of water level prediction calculations for more effective river management. In August 2016, Hokkaido was visited by four typhoons, whose heavy rainfall caused severe flooding. In the Tokoro river basin of Eastern Hokkaido, the water level (WL) at the Kamikawazoe gauging station, which is at the lower reaches exceeded the design high-water level and the water rose to the highest level on record. To predict such flood conditions and mitigate disaster damage, it is necessary to improve the accuracy of prediction as well as to prolong the lead time (LT) required for disaster mitigation measures such as flood-fighting activities and evacuation actions by residents. There is the need to predict the river water level around the peak stage earlier and more accurately. Previous research dealing with WL prediction had proposed a method in which the WL at the lower reaches is estimated by the correlation with the WL at the upper reaches (hereinafter: "the water level correlation method"). Additionally, a runoff model-based method has been generally used in which the discharge is estimated by giving rainfall prediction data to a runoff model such as a storage function model and then the WL is estimated from that discharge by using a WL discharge rating curve (H-Q curve). In this research, an attempt was made to predict WL by applying the Random Forest (RF) method, which is a machine learning method that can estimate the contribution of explanatory variables. Furthermore, from the practical point of view, we investigated the prediction of WL based on a multiple correlation (MC) method involving factors using explanatory variables with high contribution in the RF method, and we examined the proper selection of explanatory variables and the extension of LT. The following results were found: 1) Based on the RF method tuned up by learning from previous floods, the WL for the abnormal flood case of August 2016 was properly predicted with a lead time of 6 h. 2) Based on the contribution of explanatory variables, factors were selected for the MC method. In this way, plausible prediction results were obtained.
- Publication:
-
AGU Fall Meeting Abstracts
- Pub Date:
- December 2017
- Bibcode:
- 2017AGUFM.H33C1685N
- Keywords:
-
- 1894 Instruments and techniques: modeling;
- HYDROLOGY;
- 1914 Data mining;
- INFORMATICS;
- 1916 Data and information discovery;
- INFORMATICS;
- 1942 Machine learning;
- INFORMATICS