Estimation of Catchment Transit Time in Fuji River Basin by using an improved Tank model
Abstract
As an important parameter that reflects the characteristics of catchments, the catchment transit time (CTT) has been given much more widely attentions especially in recent years. The CTT is defined as the time water spends travelling through a catchment to the stream network [1], and it describes how catchments retain and release water and solutes and thus control geochemical and biogeochemical cycling and contamination persistence [2]. The objectives of the present study are to develop a new approach for estimating CTT without prior information on such TTD functions and to apply it to the Fuji River basin in the Central Japan Alps Region. In this study, an improved Tank model was used to compute mean CTT and TTD functions simultaneously. It involved water fluxes and isotope mass balance. Water storage capacity in the catchment, which strongly affects CTT, is reflected in isotope mass balance more sensitively than in water fluxes. A model calibrated with observed discharge and isotope data is used for virtual age tracer computation to estimate CTT. This model does not only consider the hydrological data and physical process of the research area but also reflects the actual TTD with considering the geological condition, land use and the other catchment-hydrological conditions. For the calibration of the model, we used river discharge record obtained by the Ministry of Land, Infrastructure and Transportation, and are collecting isotope data of precipitation and river waters monthly or semi-weekly. Three sub-catchments (SC1~SC3) in the Fuji River basin was selected to test the model with five layers: the surface layer, upper-soil layer, lower-soil layer, groundwater aquifer layer and bedrock layer (Layer 1- Layer 5). The evaluation of the model output was assessed using Nash-Sutcliffe efficiency (NSE), root mean square error-observations standard deviation ratio (RSR), and percent bias (PBIAS). Using long time-series of discharge records for calibration, the simulated discharge basically satisfied requirements of reproducing water fluxes and their balance, while improvements in parameter estimations relating to isotope mass balance is necessary. Water balance and isotopes balance have been exercised in abundant simulations by using Mont-Carlo method, and the optimal parameters combination generated reliable result. Later, we figured out the temporal-variant MTT as well as the degree of influence that brought by precipitation event, where the results showed inverse relationship between precipitation amount and MTT value. Reference: [1] Jeffrey. J. McDonnell, Kevin J. McGuire, Aggarwal, P., et al. 2010. How old is stream water? Open questions in catchment transit time conceptualization, modeling and analysis. Hydro. Process. 24, 1745-1754. [2] Kevin J. McGuire, Jeffrey J. McDonnell. 2006. A review and evaluation of transit time modeling. Journal of Hydrology. 330, 543-563.
- Publication:
-
AGU Fall Meeting Abstracts
- Pub Date:
- December 2013
- Bibcode:
- 2013AGUFMGC51D1014W
- Keywords:
-
- 1804 HYDROLOGY Catchment;
- 1847 HYDROLOGY Modeling;
- 1854 HYDROLOGY Precipitation;
- 1860 HYDROLOGY Streamflow