Simulation technology used for risky assessment in deep exploration project in China
Abstract
Deep exploration has been carried out in China for five years in which various heavy duty instruments and equipments are employed for gravity, magnetic, seismic and electromagnetic data prospecting as well as ultra deep drilling rig established for obtaining deep samples, and so on. The deep exploration is a large and complex system engineering crossing multiple subjects with great investment. It is necessary to employ advanced technical means technology for verification, appraisal, and optimization of geographical prospecting equipment development. To reduce risk of the application and exploration, efficient and allegeable management concept and skills have to be enhanced in order to consolidate management measure and workflow to benefit the ambitious project. Therefore, evidence, prediction, evaluation and related decision strategies have to be taken into accouter simultaneously to meet practical scientific requests and technique limits and extendable attempts. Simulation technique is then proposed as a tool that can be used to carry out dynamic test on actual or imagined system. In practice, it is necessary to combine the simulation technique with the instruments and equipment to accomplish R&D tasks. In this paper, simulation technique is introduced into the R&D process of heavy-duty equipment and high-end engineering project technology. Based on the information provided by a drilling group recently, a digital model is constructed by combination of geographical data, 3d visualization, database management, and visual reality technologies together. It result in push ahead a R&D strategy, in which data processing , instrument application, expected result and uncertainty, and even operation workflow effect environment atmosphere are simulated systematically or simultaneously, in order to obtain an optimal consequence as well as equipment updating strategy. The simulation technology is able to adjust, verify, appraise and optimize the primary plan due to changing in the real world or process, which can provide new insight to the equipment to meet requests from application and construction process and facilitates by means of direct perception and understanding of installation, debugging and experimental process of key equipment for deep exploration. Finally, the objective of project cost conservation and risk reduction can be reasonably approached. Risk assessment can be used to quantitatively evaluate the possible degree of the impact. During the research and development stage, information from the installation, debugging and simulation demonstration of the experiment process of the key instrument and equipment are used to evaluate the fatigue and safety of the device. It needs fully understanding the controllable and uncontrollable risk factors during the process, and then adjusting and improving the unsafe risk factors in the risk assessment and prediction. With combination with professional Geo software to process and interpret the environment to obtain evaluation parameters, simulation modeling is more likely close to exploration target which need more details of evaluations. From micro and macro comprehensive angles to safety and risk assessment can be achieved to satisfy the purpose of reducing the risk of equipment development, and to avoid unnecessary loss on the way of the development.
- Publication:
-
AGU Fall Meeting Abstracts
- Pub Date:
- December 2013
- Bibcode:
- 2013AGUFM.T11B2448J
- Keywords:
-
- 0994 EXPLORATION GEOPHYSICS Instruments and techniques