Tropospheric Parameters Determined by VLBI Within the IVS
Abstract
In April 2002 the IVS (International VLBI Service for Geodesy and Astrometry) set up the Pilot Project - Tropospheric Parameters, and the Institute of Geodesy and Geophysics (IGG), Vienna, was put in charge of coordinating the project. Seven IVS Analysis Centers have joined the project and regularly submitted their estimates of tropospheric parameters (wet and total zenith delays, horizontal gradients) for all IVS-R1 and IVS-R4 sessions since January 1st, 2002. The individual submissions are combined by a two-step procedure to obtain stable, robust and highly accurate tropospheric parameter time series with one hour resolution. The internal accuracy of the combined wet zenith delays is between 2 and 4 mm. The zenith delays derived by VLBI are compared with those provided by the International GPS Service (IGS). At sites with co-located VLBI and GPS antennas the short-term variabilities of the GPS and VLBI derived zenith delays generally show a good agreement but biases are found between the results of the two techniques. Possible reasons for these biases are discussed. Since July 1st, 2003, within the IVS the tropospheric parameters are determined as operational products. The presentation also includes the VLBI CONT02 campaign of 15 days of continuous observing in the second half of October 2002.
- Publication:
-
AGU Fall Meeting Abstracts
- Pub Date:
- December 2003
- Bibcode:
- 2003AGUFM.G51B0027S
- Keywords:
-
- 1200 GEODESY AND GRAVITY;
- 1243 Space geodetic surveys