SP-100 surety evaluation
Abstract
This report describes surety evaluations conducted during GFY 1985 in support of the General Electric design for a Space Nuclear Power System - SP-100. Those surety evaluations address both safety and safeguards requirements, which are derived from OSNP-1 and supporting documents. The report includes results of neutronics (criticality) calculations performed by Los Alamos. The results have been benchmarked against independent calculations performed by General Electric with different codes. These comparisons show close agreement, and are summarized. Los Alamos has also provided specifications of explosion and fire environments, which have been used in evaluation of the GE SP-100 concept. Following the summary of key results, surety requirements are given and recommendations toward specification of requirements for later SP-100 project phases are presented. A conceptual design summary is presented. To establish a comprehensive background for surety evaluations, a reference mission profile and potential accidents for each phase of the mission are identified. The main body of the report addresses surety of the General Electric Thermoelectric Conversion design. GE has also developed a Stirling Engine concept, and performed comprehensive surety evaluations for it. These evaluations are reported.
- Publication:
-
Unknown
- Pub Date:
- June 1985
- Bibcode:
- 1985spse.rept......
- Keywords:
-
- Explosions;
- Fires;
- Reactor Safety;
- Safety Management;
- Space Power Reactors;
- Thermoelectric Power Generation;
- Ablation;
- Engine Design;
- Environment Effects;
- Heat Transfer;
- Launching;
- Reentry;
- Risk;
- Stirling Cycle;
- Stirling Engines;
- System Failures;
- Thermal Stresses;
- Nuclear and High-Energy Physics