The low cost development, test, and production of a commercial STS upper stage: TOS
Abstract
The Space Transportation System (STS) has to compete for commercial payload launches with a variety of expendable launch vehicles (ELVs). Many of these payloads have to be placed into a final orbit which cannot be provided by the Shuttle Orbiter. An upper stage booster is, therefore, needed. The Transfer Orbit Stage (TOS) is being developed to satisfy this need at a competitive user cost. The requirements for the development and test program for the TOS system are related to a 'minimum cost - minimum risk' approach. In this context, the use of existing flight qualified 'off the shelf' hardware is to be maximized. Attention is given to a TDS system description, the development test objectives, and the TOS test program results.
- Publication:
-
AIAA, Aerospace Sciences Meeting
- Pub Date:
- January 1985
- Bibcode:
- 1985aiaa.meetT....W
- Keywords:
-
- Commercial Spacecraft;
- Orbit Transfer Vehicles;
- Space Transportation System;
- Spacecraft Design;
- Avionics;
- Ordnance;
- Performance Tests;
- Space Commercialization;
- Temperature Control;
- Three Axis Stabilization;
- Upper Stage Rocket Engines;
- Launch Vehicles and Space Vehicles