Preventative maintenance for control systems
Abstract
Preventative maintenance of the control systems should be performed on a required interval. Most manuacturers specify 6 to 12 month intervals. However, inspections can often be accomplished when the control unit or mechanical systems are out of service for a malfunction repair. A procedural checklist for proper maintenance is given.
- Publication:
-
NASA STI/Recon Technical Report N
- Pub Date:
- May 1985
- Bibcode:
- 1985STIN...8612525C
- Keywords:
-
- Control;
- Electronic Equipment;
- Systems Engineering;
- Checkout;
- Circuit Breakers;
- Maintenance;
- Electronics and Electrical Engineering