Automation of servicibility of radio-relay station equipment
Abstract
Automation of the serviceability of radio relay station equipment must ensure central gathering and primary processing of reliable instrument reading with subsequent display on the control panel, detection and recording of failures soon enough, advance enough warning based on analysis of detertioration symptoms, and correct remote measurement of equipment performance parameters. Such an inspection will minimize transmission losses while reducing nonproductive time and labor spent on documentation and measurement. A multichannel automated inspection system for this purpose should operate by a parallel rather than sequential procedure. Digital data processing is more expedient in this case than analog method and, therefore, analog to digital converters are required. Spepcial normal, above limit and below limit test signals provide means of self-inspection, to which must be added adequate interference immunization, stabilization, and standby power supply. Use of a microcomputer permits overall refinement and expansion of the inspection system while it minimizes though not completely eliminates dependence on subjective judgment.
- Publication:
-
USSR Rept Electron Elec Eng JPRS UEE
- Pub Date:
- March 1985
- Bibcode:
- 1985RpEEE.......15U
- Keywords:
-
- Automatic Test Equipment;
- Communication Equipment;
- Maintenance;
- Radio Relay Systems;
- System Failures;
- Analog To Digital Converters;
- Checkout;
- Inspection;
- Microcomputers;
- Microprocessors;
- Transmission Loss;
- Communications and Radar