Status of Fudan Van de Graaf reviewed
Abstract
The Accelerator Laboratory of Fudan University converted its 2.5 MV proton Van de Graaf to a 4 MV accelerator and the bulk of the conversion was completed in September 1979. Since then, a series of performance tests were made and the no-load voltage has reached 5 MV with the accelerator tube filled with 5 atmospheres of nitrogen gas. Because of accelerator tube problem, the particle energy failed to reach the 4 MeV target. Although a stable 3.2 MeV was once obtained during adjustment, the maximum energy available for experiments was only 2.85 MeV. The operation of the accelerator in the years since 1981 is described.
- Publication:
-
China Rept Sci Technol JPRS CST
- Pub Date:
- August 1985
- Bibcode:
- 1985ChRST......122Y
- Keywords:
-
- Performance Tests;
- Proton Beams;
- Revisions;
- Van De Graaff Accelerators;
- Adjusting;
- Backscattering;
- Beam Currents;
- Fluorescence;
- Ion Implantation;
- Nitrogen;
- Particle Accelerator Targets;
- Protons;
- Spectroscopy;
- Physics (General)