Interface standardization
Abstract
Central-station applications create a large and attractive market for photovoltaics in the near future. However, some significant barriers lie between the industry of today and realization of that market. Manufacturing capacity and price are two principal impediments. The Utilities, which are the future system owners, are gaining experience with central-station PV power through the Sacramento Municipal Utility District, Hesperia and similar small central-station installations. SMUD has recognized that competition must be maintained to help reduce prices. So little standardization exists that the cost is driven upward to redefine mechanical and electrical interfaces for each vendor. New structues are required for each vendor and nonoptimum field geometries result from attempts to include more than one vendor in an array field. Standards at some hardware level are required.
- Publication:
-
Flat-Plate Solar Array Res. Forum on Photovoltaic Metallization Systems
- Pub Date:
- November 1983
- Bibcode:
- 1983fpsa.proc..221S
- Keywords:
-
- Interfaces;
- Photovoltaic Cells;
- Solar Arrays;
- Standardization;
- Boundary Value Problems;
- Maintenance;
- Operating Costs;
- Structural Design Criteria;
- User Requirements;
- Electronics and Electrical Engineering