Analysis of lead-acid battery accelerated testing data
Abstract
Battelle conducted an independent review and analysis of the accelerated test procedures and test data obtained by Exide in the 3 year Phase 1 program to develop advanced lead acid batteries for utility load leveling. Of special importance is the extensive data obtained in deep discharge cycling tests on 60 cells at elevated temperatures over a 2-1/2 year period. The principal uncertainty in estimating cell life relates to projecting cycle life data at elevated temperature to the lower operating temperatures. The accelerated positive grid corrosion test involving continuous overcharge at 500C provided some indication of the degree of grid corrosion that might be tolerable before failure. The accelerated positive material shedding test was not examined in any detail. Recommendations are made for additional studies.
- Publication:
-
Final Report Battelle Columbus Labs
- Pub Date:
- June 1983
- Bibcode:
- 1983bclo.reptR....C
- Keywords:
-
- Corrosion;
- Data Processing;
- Estimates;
- Service Life;
- Statistical Analysis;
- Temperature Effects;
- Utilities;
- Lead Acid Batteries;
- Loads (Forces);
- Performance Tests;
- Photovoltaic Effect;
- Electronics and Electrical Engineering