Manufacturing Methods and Technology (MM and T) specifications for miniature cathode ray tube
Abstract
Earlier problems with deflection coil design concerning barreling sensitivity and horizontal linearity were resolved. Life-testing of the P-43 phosphor screen continued. In house test fixtures were designed and fabricated, and are now under Engineering review. TEI's procedures were refined for manufacturing tests and for environmental and reliability testing. CRT assemblies for the 3rd Submission of Phase I Engineering Samples were completed and ready for source testing. TEI began to manufacture and test CRT assemblies for Phase II - Confirmatory Samples.
- Publication:
-
Quarterly Report
- Pub Date:
- July 1982
- Bibcode:
- 1982tei..reptR....B
- Keywords:
-
- Cathode Ray Tubes;
- Deflection;
- Life (Durability);
- Manufacturing;
- Miniaturization;
- Assembly;
- Environmental Tests;
- Fabrication;
- Phosphors;
- Reliability;
- Specifications;
- Test Equipment;
- Electronics and Electrical Engineering