Manufacturing Methods and Technology (MM&T) specifications for miniature cathode ray tube
Abstract
The two CRT assemblies for the 2nd Submission of Phase I - Engineering Samples were successfully fabricated, acceptance-tested, and delivered to NV&EOL. TEI proposed a revision to its PERT Chart to allow sufficient time for the engineering and reliability testing stipulated by MM&T H799838 for Phase II and Phase III of the project. Rhw COR believed that TEI's projected revisions in the completion data could jeopardize the Army's schedule for the Advanced Attack Helicopter (AAH) and, therefore, joint efforts and adjustments are in progress to shorten the proposed production and testing schedule by four months.
- Publication:
-
Quarterly Report
- Pub Date:
- January 1982
- Bibcode:
- 1982tei..reptQ....B
- Keywords:
-
- Cathode Ray Tubes;
- Equipment Specifications;
- Fabrication;
- Manufacturing;
- Miniature Electronic Equipment;
- Military Helicopters;
- Reliability;
- Sampling;
- Systems Engineering;
- Electronics and Electrical Engineering