Project demonstration of wind turbine electricity: Interconnecting a northern Michigan fruit farm with a major utility
Abstract
A project to interconnect a farm wind turbine with a utility is reported. Included are a summary of accomplishments and daily major events, correspondence relevant to the project (letters explaining the delay of installation, extending the period of performance, tax credits, net energy sellback legislation, etc.), publicity, legal aspects, maintenance and repair, analysis of test data, and accounting.
- Publication:
-
Final Report Cherrywood Farms
- Pub Date:
- October 1982
- Bibcode:
- 1982cwf..rept.....A
- Keywords:
-
- Michigan;
- Wind Turbines;
- Windmills (Windpowered Machines);
- Windpower Utilization;
- Cost Estimates;
- Joining;
- Site Selection;
- Utilities;
- Electronics and Electrical Engineering