Residual-energy-applications program: Support and integration report
Abstract
The proposed government-owned EAST Facility at the Savannah River Plant in Aiken, South Carolina, would provide capabilities for development and confidence testing of industrial heat pumps, high temperature bottoming cycles, low temperature Rankine cycle power generation systems, and absorption chillers. This report describes support and integration activities that were performed during the contract year. The various elements that impact on the EAST Facility are discussed and an assessment of the EAST Facility mission is given. The report concludes with proposed milestones, schedules, and costs for design, construction, and operation of the facility.
- Publication:
-
NASA STI/Recon Technical Report N
- Pub Date:
- November 1980
- Bibcode:
- 1980STIN...8133438M
- Keywords:
-
- Energy Technology;
- Systems Analysis;
- Test Facilities;
- Absorption Cooling;
- Electric Generators;
- Heat Pumps;
- Project Planning;
- Rankine Cycle;
- Waste Energy Utilization;
- Fluid Mechanics and Heat Transfer