FEI camera system, acceptance test and checkout procedure, as installed in BQM-34 A/S and BQM-34 E/T
Abstract
This report describes the acceptance test and checkout procedure for Firing Error Indicator Camera System. This system can be installed in the BQM-34A/S and BQM-34E/T aerial targets. The tests presented herein constitute a quality control check and acceptance test to be performed on each camera system.
- Publication:
-
NASA STI/Recon Technical Report N
- Pub Date:
- September 1979
- Bibcode:
- 1979STIN...8014378B
- Keywords:
-
- Cameras;
- Errors;
- Scoring;
- Target Acquisition;
- Checkout;
- Quality Control;
- Reliability;
- Instrumentation and Photography