LACV-30 test and demonstration report
Abstract
This report presents the test data and analysis of all acceptance and type tests performed on the LACV-30-1 and -2 vehicles. The tests were performed as specified in Contract No. DAAK02-75-C-0149 dated 7 March 1975. All test data were accepted by the U.S. Army prior to delivery of the vehicles. Two corrective actions were required on the LACV-30-1, installation of a new horn and addition of bow pre-loaders to maintain pressure on the front landing pads during swing crane operation.
- Publication:
-
Final Report Textron Bell Aerospace Co
- Pub Date:
- February 1978
- Bibcode:
- 1978tbac.rept.....L