ATWS; a reappraisal. Part 2: Evaluation of societal risks due to reactor protection system failure. Volume 2: BWR fault tree evaluation
Abstract
A detailed description of the re-evaluation and expansion of the fault tree is presented. Details of the reactor protection system evaluation to assure perception are examined. The new results for rps unavailability show that the median value is now approximately a factor of six and the mean value an order of magnitude smaller.
- Publication:
-
Unknown
- Pub Date:
- August 1976
- Bibcode:
- 1976resr....2.....E
- Keywords:
-
- Communities;
- Nuclear Reactor Control;
- Nuclear Reactors;
- Safety Factors;
- Safety Management;
- Accident Prevention;
- Probability Theory;
- Protection;
- Nuclear and High-Energy Physics