Frequency modulation system test procedure shuttle task 501 approach and landing test configuration
Abstract
Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).
- Publication:
-
NASA STI/Recon Technical Report N
- Pub Date:
- January 1976
- Bibcode:
- 1976STIN...7618205D
- Keywords:
-
- Space Shuttle Orbiters;
- Spacecraft Communication;
- Approach;
- Communication Equipment;
- Frequency Modulation;
- Horizontal Spacecraft Landing;
- Performance Tests;
- Space Communications, Spacecraft Communications, Command and Tracking