Status report on the GSI on-line mass separator facility
Abstract
The status of the GSI mass separator facility on-line to the heavy-ion accelerator UNILAC at Darmstadt is described, covering the technical development since the start of operation in 1976.
- Publication:
-
Nuclear Instruments and Methods in Physics Research
- Pub Date:
- July 1981
- DOI:
- 10.1016/0029-554X(81)90888-0
- Bibcode:
- 1981NIMPR.186...61B