Study on the bearing capacity of embedded chute on shield tunnel segment
Abstract
The method of perforation and steel implantation is often used to fix and install pipeline, cables and other facilities in the shield tunnel, which would inevitably do damage to the precast segments. In order to reduce the damage and the resulting safety and durability problems, embedded chute was set at the equipment installation in one shield tunnel. Finite element models of segment concrete and steel are established in this paper. When water-soil pressure calculated separately and calculated together, the mechanical property of segment is studied. The bearing capacity and deformation of segment are analysed before and after embedding the chute. Research results provide a reference for similar shield tunnel segment engineering.
- Publication:
-
IOP Conference Series: Earth and Environmental Science
- Pub Date:
- May 2018
- DOI:
- 10.1088/1755-1315/153/5/052050
- Bibcode:
- 2018E&ES..153e2050F